Broadband update

There is a new Cabinet due to go in the Village in October – Cabinet P10. This is at the rear of 1 Walnut Tree Meadows. There is quite a bit more work planned in Stonham, see below:

Fibre Cabinet Fibre Status Phase Properties
Passed
Vendor Approx
Post Code
Cabinet P1 FTTC Available from 30th August 2017 Phase SEP Suffolk 16b 287 Huawei IP14 5LE
Cabinet P2 FTTC Available from 4th October 2014 Phase BDUK Suffolk 12a 194 Huawei IP14 5EW
Cabinet P3 FTTC Available from 6th June 2015 Phase BDUK Suffolk 13b 309 Huawei IP14 5DP
Cabinet P4 FTTC Available from 2nd December 2017 Phase SEP Suffolk 17a 35 Huawei IP14 5EY
Cabinet P7 FTTC Available from 11th January 2018 Phase SEP Suffolk 17a 47 Huawei IP14 5LH
Cabinet P8 FTTC Available from 16th November 2017 Phase SEP Suffolk 17a 106 Huawei IP14 6AN
Cabinet P10 FTTC doing Field Survey, live due by September 2018 Phase SEP Suffolk 18a Huawei
Cabinet P12 FTTC doing Field Survey, live due by May 2019 Phase SEP Suffolk 19a Huawei
Cabinet P14 FTTC doing Field Survey, live due by May 2019 Phase SEP Suffolk 22a Huawei
Cabinet P15 FTTC doing Field Survey, live due by May 2019 Phase SEP Suffolk 22a Huawei
Exchange 9 FTTC doing Field Survey, live due by March 2019 Phase SEP Suffolk 22a Huawei
Exchange 10 FTTC doing Field Survey, live due by March 2019 Phase SEP Suffolk 22a Huawei
Exchange 18 FTTC doing Field Survey, live due by April 2018 Phase SEP Suffolk 19a Huawei
Exchange 20 FTTC doing Field Survey, live due by December 2018 Phase SEP Suffolk 20a Huawei